S13
S13 Series Energy-Saving Oil-Filled Power Transformer Save operational costs with our S13 high-efficiency oil-filled distribution transformer. Featuring premium grade mineral insulation oil and advanced winding technology, this series delivers ultra-low no-load losses, lower temperature rise, and exceptional thermal performance even under continuous full-load conditions. Voltage Range: 6kV – 69kV Step-Down Distribution Highlights: High energy efficiency (30% lower loss), maintenance-reducing sealed tank, weather-resistant finish Supply Ability: Direct Manufacturer Supply | Fast Global Delivery
The S13 Series Oil-Immersed Distribution Transformer represents the next generation of energy-efficient power equipment. Designed for reliable step-down voltage distribution in utility networks, industrial plants, mining operations, and commercial facilities, the S13 model features advanced core manufacturing technology to significantly reduce no-load losses and operational costs.
Available across voltage ratings from 6kV up to 69kV, our S13 transformers strictly comply with IEC standard, and international standards, offering exceptional short-circuit resistance, low noise levels, and long service life under tough environment conditions.
High Efficiency & Energy Saving: The S13 series reduces no-load loss by up to 30% and no-load current by up to 70% compared to standard S11 series, saving substantial electricity cost.
Superior Thermal Performance: High-grade mineral transformer oil ensures rapid heat dissipation and robust insulation strength under continuous full-load operation.
Corrosion-Resistant & Fully Sealed Tank: Corrugated radiator tank design accommodates oil expansion while preventing external moisture and oxygen degradation.
High Short-Circuit Strength: Precision-wound copper/aluminum coils with upgraded structural clamping provide superior mechanical endurance during grid faults.
Multi-Voltage Adaptability: Flexible primary voltage options ranging from medium voltage (6kV, 10kV, 11kV, 15kV, 20kV, 22kV, 25kV) to high voltage (30kV, 35kV, 69kV).
| Parameter | Specifications / Range |
| Product Series | S13 Series Oil-Immersed / Oil-Filled Transformer |
| Rated Primary Voltage | 6kV, 10kV, 11kV, 15kV, 20kV, 22kV, 25kV, 30kV, 35kV, 69kV (Customizable) |
| Secondary Voltage | 0.4kV, 415V, 433V, 6.3kV, 10.5kV, or as specified |
| Rated Capacity Range | 30 kVA – 20,000 kVA or others |
| Frequency | 50 Hz / 60 Hz |
| Number of Phases | 3 Phase |
| Vector Group | Dyn11 / Yyn0 / Ynd11 (Customizable) |
| Cooling Method | ONAN (Oil Natural Air Natural) / ONAF |
| Insulation Class | Class A |
| Compliance Standards | EN IEC61558 EN IEC61000 ISO9001 |
Our S13 oil-immersed transformers are widely deployed in diverse electrical infrastructure projects worldwide:
Power distribution substations & public utility grids
Industrial manufacturing facilities & steel mills
Renewable energy integration (Solar PV plants & Wind farms)
Commercial real estate, infrastructure, and mining enterprises
Factory Testing: 100% routine tests before dispatch, including impulse voltage test, temperature rise test, power frequency withstand voltage test, and oil dielectric strength test.
Tailored Solutions: On-load tap changers (OLTC), off-circuit tap changers (OCTC), special bushings, and customized enclosure ratings available upon request.
Q1: What is the difference between S11 and S13 oil-immersed transformers?
A: The S13 series uses advanced core laminated materials and optimized winding design, resulting in significantly lower no-load loss (approx. 20%-30% lower than S11) and lower operating noise.
Q2: Can you customize the primary voltage according to our local grid standards (e.g., 11kV, 33kV, 69kV)?
A: Yes, we provide full custom design according to your local grid requirement, dual-voltage options, and special vector group configurations.
Q3: What is the typical lead time for custom transformer orders?
A: Standard models take 10 days. Customized or high-capacity units (e.g., 35kV/69kV) usually require 15-20 days for complete manufacturing and factory testing.